Getting a new driveway is a significant investment, and understanding exactly what happens from first phone call to final curing helps you prepare your property, ask the right questions, and recognize quality work when you see it. Here is a step-by-step walkthrough of how Harrison Paving handles every residential driveway project across South Jersey.
Step 1: The Free Estimate
Everything starts with an on-site estimate. A member of our team visits your property, measures the driveway area, evaluates the existing surface condition, checks the grading and drainage, and discusses your goals and concerns. We provide a detailed written proposal that specifies every aspect of the work, demolition method, base preparation, asphalt mix and thickness, timeline, and total cost. There are no hidden fees, and the estimate is free with no obligation.
This visit typically takes 20 to 30 minutes. We encourage homeowners to be present so we can walk the property together and explain what we see. For South Jersey properties, we assess soil conditions, drainage patterns, and access considerations specific to your area.
Step 2: Scheduling and Preparation
Once you approve the estimate, we schedule your project based on weather conditions and our crew calendar. During spring and summer peak season, lead times typically run one to three weeks. We will confirm the exact date a few days before the work and provide instructions for any homeowner preparation needed.
Before paving day, clear vehicles, toys, planters, and any other items from the driveway and adjacent areas. If your mailbox is in the driveway area, our crew will work around it. Mark any underground utilities, sprinkler heads, or invisible fence wires near the driveway edges, we do not want to damage anything during excavation.
Step 3: Old Surface Removal
On paving day, our crew arrives early, typically by 7 AM, with all equipment and materials. If you have an existing asphalt or concrete driveway, the first step is demolition. We use a skid steer and dump trucks to break up and remove the old surface, hauling the debris to an approved recycling facility.
Demolition reveals the condition of the base material beneath. Sometimes the existing base is in better condition than expected and can be reused with re-compaction. Other times, especially in older South Jersey driveways, the base has deteriorated and needs partial or full replacement. We discuss any changes with you on-site before proceeding.
Step 4: Grading and Base Preparation
This is the most important step and where quality contractors earn the price difference. We grade the subgrade to establish proper drainage, water should flow away from your garage and home toward the street or approved drainage areas. The minimum slope is one-quarter inch per foot.
We then install crushed stone aggregate base, typically four to six inches for residential driveways, and compact it with a vibratory roller or plate compactor. The compacted base must be uniform and stable before any asphalt is applied. In areas of South Jersey with clay soils, additional base depth or drainage measures may be necessary to prevent future settling.
Step 5: Hot-Mix Asphalt Application
The hot-mix asphalt arrives from the batch plant at 275 to 300 degrees Fahrenheit. Our crew spreads the asphalt to the specified thickness, two to two and a half inches for most residential driveways, using a combination of machine paving and hand raking for areas around transitions, curves, and edges.
The asphalt must be placed and compacted while still hot. Our crew works methodically to ensure uniform coverage and consistent thickness across the entire surface. This is where experience matters, knowing how to handle the material at the right temperature, how to work around obstacles, and how to create smooth transitions at the garage apron and street edge takes years to master.
Step 6: Compaction
Immediately after placement, we compact the asphalt with a professional vibratory roller, making multiple passes to achieve the required density. Proper compaction is critical, it eliminates air voids, forces the aggregate together, and creates a dense, water-resistant surface. Under-compacted asphalt will be porous, soft, and prone to premature failure.
Edge compaction receives special attention. Driveway edges that are not properly compacted will crumble and deteriorate first, which is why you often see edge failure on cheaply installed driveways.
Step 7: Cleanup and Curing
Our crew cleans up all debris, sweeps adjacent areas, and leaves your property as clean as we found it. We walk you through the completed work, explain the curing process, and answer any remaining questions.
Your new driveway will be ready for vehicle traffic within 24 to 48 hours under normal conditions. Full curing takes 60 to 90 days during warm weather, during which the surface will remain slightly soft and pliable. During this period, avoid sharp turns and do not park in the same spot for extended periods. Your first sealcoat should be applied 12 to 18 months after installation.
Schedule Your Project
Ready to get started? Call Harrison Paving at (856) 694-4181 for a free on-site estimate. We have been guiding South Jersey homeowners through the paving process for over 40 years, and we will make sure you know exactly what to expect every step of the way.
Related Articles
How to Prepare for Driveway Paving Day
A little preparation on your part makes paving day smoother and helps ensure the best results for your new driveway.
How Much Does an Asphalt Driveway Cost in South Jersey? (2026)
Real 2026 price ranges for new driveways, replacements, resurfacing and sealcoating across South Jersey, and what makes one driveway cost more than another.
Recycled Asphalt Driveways: Pros, Cons & What to Know
Recycled asphalt can save money, but it's not right for every project. Here's an honest look at the pros and cons.
Driveway Drainage Solutions for South Jersey Homeowners
Standing water is your driveway's worst enemy. Here's how to solve common drainage problems that South Jersey homeowners face.